June 8, 2020 – The Bureau of Reclamation(BOR) released the draft Environmental Impact Statement. A 90-day comment period began and ends on September 8, 2020.
Early July 2020 – CSU’s team publishes an analysis of the draft EIS to help with effective comments.
July 20, 2020 at 6 pm, CSU virtual workshop on “How to Comment.” Register.
September 8, 2020 – Draft EIS Comment Period closes.
January 2021 – Bureau of Reclamation issues Record of Decision (ROD).
January 19, 2021 – Utah Legislature convenes; may introduce Lake Powell Pipeline funding bill committing billions of dollars to build the Lake Powell Pipeline; to be repaid by Washington County residents.